I build buildings on a much smaller scale, but In general, not including prefab orders, engineering changes, inspections, staking etc., and not having access to plans,,,,
The graders and earth-movers are still relocating the soil. It is really taking shape. A meteor hitting that spot would have been much faster but the downside is prohibitive.
Next, cranes drilling caissons, cranes hoisting pre-built forms, welders and cement mixers/boom pumpers...
What's left,,
*complete excavation grading, shoring, compaction,
*separate excavation for column bases and other footings, drilling caissons to bedrock,
*foundation forming and reinforcing steel,
*subterranean (sub-t) waterproofing at perimeter and under field, drainage and pump vaults for stadium and lake,
*installation of infrastructure (ie: conduits, pipework, waste / utility supply, mechanical supply and all other under-grounding,
*pumping concrete for foundation, column bases, structural footings and retaining walls, (could include some of the inner bowl, field base and sub-t access to and for sub-t habitable spaces (ie: 3 locker rooms, loading dock's, elevator shafts, escalators, lake, etc.),
*fabrication and installation of steel framework for structure as per plan including escalators, elevator, roof, etc.,
*ETFE roof installation, (this is a typical early stage time to install the roof to protect the environment beneath it.),
*more concrete forming and pours for interior structural walls not related to the roof or waterproofing.
*pull wires and connect water, sewer, gas, propane, fiber optic, telecom etc to city services,
*back-fill where applicable and regrade exterior including lake,
*complete connector roadways for controlled access, initial striping,
*construct interior walls and general framing,
*fenestration (glass/windows) where applicable (int/ext),
*interior, exterior finishes and flat work finishes, columns, paint,
*terminate / trim out all telecom, electrical connections at the end locations / fixtures / scoreboards / press boxes , roof billboard etc.
*stub out water and waste lines.
*more interior finishes (ie: set up locker rooms, kitchens, bars - counter-tops, restaurants, luxury suites, stadium seating etc.),
*trim out plumbing water and all other utility services,
*exterior / interior landscape, irrigation, filters, water features, guard rails, etc.
*install turf, stripe, new uniforms and we should be ready to go win us some games in our new house....